The forms are in for Brown Mountain Observatory. With the required size of the structure and the concrete new concrete calculations, a new 4′ strip was added to the entry side of the observatory and rebar cut for that area. the divider framing board will be removed prior to pouring.
Brown Mountain Observatory gets formed
- brownmtn
- February 17, 2016
- Uncategorized